Written by

When the expertise is part of the team but isn’t available when needed

In a traditional project and line organization, specialist expertise is often organized into functional units and shared across several projects. When planning a project, we estimate which skills will be needed, to what extent, and when. An architect might be allocated 20% of their time, a UX designer 30%, and another specialist full-time for a few weeks later in the project.

This approach makes sense when the work is predictable enough. If we can describe in advance what needs to be done and roughly when different skills will be required, we can plan people’s involvement accordingly. Specialists can contribute at the right time without being assigned to a project full-time.

But in complex product development, we cannot know in advance which solutions will achieve the outcomes we’re looking for. We need to experiment, gather feedback, and let what we learn shape what we do next. We often have a good idea of which skills we’ll need, but not which questions will arise, which perspectives will matter, or which decisions we’ll have to make along the way.

When we’re no longer working from a predefined solution that different specialists are expected to help implement, expertise takes on a different role. The team needs to discover and develop the solution together. Specialists contribute more than a specific piece of work. Their perspectives influence how the team understands the problem, which possibilities it considers, and what it decides to try. Architects aren’t only needed when an architectural decision has to be made, and UX expertise isn’t only valuable when something needs to be designed.

This is one of the reasons we build stable, cross-functional product teams. Different areas of expertise need to come together as the team’s understanding develops and solutions begin to take shape. The team needs to be able to explore questions together and make decisions as they arise.

This is where we risk falling into the Availability Trap.

We identify the expertise a product team needs but continue to plan people’s involvement as though we could predict exactly when their contributions will be required. We staff the team with 20% of one specialist, 30% of another, and perhaps a third full-time for a few weeks. On the organizational chart, the team looks cross-functional. But the staffing plan tells us nothing about whether the right people will be available to work together when questions actually arise.

The Availability Trap. The team has all the necessary expertise on the organizational chart, but when questions arise and decisions need to be made, the right people aren’t always available. This can cause delays, but it can also mean the team moves forward without perspectives that might have changed both its understanding of the problem and the solution it chooses.

In practice, a specialist whose perspective is needed may be working with another team. The people who need to work through a question together may not be available at the same time, or the authority to make a decision may rest with someone who isn’t there. The team ends up waiting or trying to coordinate everyone’s availability.

The same problem can occur when someone works full-time with the team for a limited period. Having a specialist available for three weeks doesn’t help if the critical question arises the following week. We may have followed the staffing plan perfectly and still find ourselves without the expertise we need.

But sometimes the problem is harder to spot. The team moves forward without a perspective that could have changed how it understood the problem or which solution it chose. Nobody notices what was missing, because nobody knew that particular expertise would be needed at that moment.

This doesn’t mean every specialist needs to be a full-time member of every team. Some expertise can be shared across teams. But the more frequently a particular skill is needed, the harder it is to predict when it will be needed, and the more important that perspective is to the team’s work, the harder it becomes to rely on scheduled contributions. The same applies to decision-making authority that the team regularly needs to exercise.

Leadership needs to change as well. Rather than primarily planning when specialists should carry out particular tasks, leaders need to make sure teams can draw on their expertise as questions emerge. This isn’t about making everyone available all the time. It’s about enabling teams to explore problems, develop solutions, and make decisions without having to schedule every specialist contribution in advance.

The Availability Trap occurs when we build cross-functional product teams but continue to plan access to expertise and decision-making authority as though we could predict when they will be needed. We have staffed the team with the right skills on paper, but haven’t created the conditions for that expertise to contribute when it matters most.

More traps

The Negotiation Trap in Prioritization is one of several traps in the series Traps when moving from projects to product teams.

See the bigger picture

The classification trap in prioritization is one example of what can happen when we change the way we work without fully changing the underlying logic.

Our Project vs Product Organization in a Nutshell poster explores this shift from several perspectives including strategy, execution, governance, teams, funding, culture and organization.

Written by

When we build product teams but continue to optimize individual utilization

In a traditional project and line organization, specialist expertise is often organized into functional units. Line managers are responsible for matching skills and capacity to the needs of different projects. Architects, business analysts, developers, testers, and other specialists are assigned to projects, either part-time or full-time for limited periods.

This approach makes sense in that kind of organization. Line managers are expected to provide the right expertise at the right time while keeping people fully utilized. Optimizing resource utilization becomes part of doing a good job.

But moving to a product-oriented organization requires a different approach.

In complex product development, we cannot know in advance which solutions will achieve the desired outcomes. We need to explore, experiment, gather feedback, and learn. This is why we want stable, cross-functional product teams that can take responsibility for a product, work together over time, and continuously deliver value. Stability doesn’t mean that team membership can never change. It means having the continuity and collective capability needed to take ownership and deliver value over time.

This is where we risk falling into the Fragmentation Trap.

We create product teams but continue to allocate specialists across them to keep individual utilization high.

The Fragmentation Trap in Staffing. We create product teams but continue to split people’s time between them, either in parallel or through short-term assignments. On paper, we’re using capacity efficiently. In practice, we risk losing focus, continuity, and flow.

An architect is expected to do architecture work. When there isn’t enough architecture work in one team, we share the architect with another. A specialist who won’t be needed until later is brought in for a few weeks. And when the demand for a particular role temporarily decreases, we move that person to wherever their expertise is needed.

Each decision may seem perfectly reasonable. We make use of scarce expertise where it’s needed and avoid having people without enough work to do. But taken together, these decisions recreate the very fragmentation that stable product teams were intended to overcome.

When people split their time between several teams, they constantly switch between problems, priorities, and contexts. Research on task switching and attention residue shows that these transitions can come at a cost, making it harder to maintain focus.

Fragmentation also creates competing priorities. If a specialist works in two teams, each with its own backlog, who decides which work takes precedence? Allocating someone 50% to each team doesn’t resolve that question. It describes how their time is supposed to be divided, but not what should happen when both teams need them at the same time. Nor does it account for the time and effort involved in switching between different problems and contexts. Without shared prioritization, individuals may end up having to make these trade-offs themselves or negotiate between competing demands.

Short-term full-time assignments don’t create the same constant switching between teams. However, continuity can still be disrupted when a specialist moves on while work is still in progress. Knowledge and context may be lost, and when several teams depend on the same people, delays can spread between them. The result is more dependencies, more work in progress, and longer lead times.

This doesn’t mean specialist expertise should never be shared between teams. Temporary assignments can be valuable, and some capabilities may need to be shared. The difference is whether these arrangements strengthen teams’ ability to take responsibility for their work or leave them dependent on people constantly moving between teams.

This is also the difference between optimizing individual utilization and optimizing the flow of value through the organization. When we try to keep every specialist fully occupied, we risk creating waiting times, competing priorities, and more work in progress. Keeping everyone busy doesn’t necessarily mean more work gets finished. In fact, high utilization in parts of the system can make overall flow worse. This is a central idea in flow-based thinking and in Henrik Kniberg’s discussion of the Resource Utilization Trap.

Shared prioritization can help reduce competing demands between teams. But even when teams work towards the same priorities, the cost of switching contexts and disrupting continuity remains.

This also calls for a shift in leadership. In a traditional project and line organization, line managers largely work within the system, matching expertise to demand and allocating capacity within existing structures. In a product-oriented organization, leaders need to spend more time improving the system, creating the conditions for stable teams and an effective flow of value.

The Fragmentation Trap occurs when we build stable product teams but continue to optimize individual utilization. We keep people fully occupied, but in doing so, we risk making it harder for teams to stay focused, work together over time, and continuously deliver value.

More traps

The Negotiation Trap in Prioritization is one of several traps in the series Traps when moving from projects to product teams.

See the bigger picture

The classification trap in prioritization is one example of what can happen when we change the way we work without fully changing the underlying logic.

Our Project vs Product Organization in a Nutshell poster explores this shift from several perspectives including strategy, execution, governance, teams, funding, culture and organization.

Written by

When we build product teams around roles rather than the capabilities they need

In a traditional project and line organization, work is often divided along specialist roles. Architects are responsible for architecture, developers for development, and testers for testing. When staffing a project, we identify which roles are needed and how many people we need in each area. Work is distributed among specialists and handed over as different parts are completed.

This approach makes sense when work can be broken down into activities that are planned and tracked separately. We develop deep expertise in each discipline and assign tasks to those best qualified to perform them. Leadership often follows the same logic. Managers set individual performance goals, track personal deliverables, and take responsibility for employees’ professional development. Role descriptions, objectives, and performance reviews reinforce expectations about what each person is supposed to contribute.

But moving to a product-oriented organization requires a different approach.

We want stable, cross-functional teams that can take responsibility for a product and the outcomes we aim to achieve. In complex product development, we cannot know in advance which solutions will work. Teams need to explore problems, test ideas, make decisions, and learn from the results. This means designing teams around their purpose. What problems do they need to solve? What decisions should they be able to make? What expertise do they need, and what capabilities must they develop to achieve their goals without unnecessary dependencies?

This is where we risk falling into the Role Trap.

When creating product teams, we often bring the roles from the project organization with us. We try to include every specialist role involved in the development process, even if some people only contribute a small part of their time. The result can be a large product team with many people and all the roles represented, but limited ability to work effectively together. We have all the roles covered, but we haven’t necessarily built the capabilities the team needs.

Once we organize around roles, they also tend to determine how work gets done. The architect handles architecture, the developer writes the code, and the tester does the testing. When development is finished, the work is handed over to testing. When an architectural question comes up, the team waits for the architect. And when the tester is overloaded, others may start new work rather than help finish what is already in progress.

We have moved the handovers inside the team, but we haven’t eliminated them.

When moving from a project organization to product teams, we risk bringing the same specialist roles and handovers into the team instead of building a smaller team with the shared capability to take responsibility for development from end to end.

Specialists become bottlenecks while others wait or start new tasks. The team becomes vulnerable when someone is absent, and knowledge remains concentrated in a few individuals. Individual performance goals can make matters worse. If developers are evaluated on their development output and testers on their testing output, focusing on their own tasks becomes the rational choice. Helping a colleague, learning something new, or solving a problem together may compete with what each person is expected to deliver.

We expect the team to take collective responsibility for results, yet we continue to manage and measure individual performance.

This doesn’t mean specialist expertise should disappear. Quite the opposite. We still need deep knowledge in different disciplines. But a team’s capability is more than the sum of its members’ individual expertise. In LeSS, the term generalizing specialists describes people who retain their deep expertise while broadening their ability to contribute in other areas. Not everyone needs to know everything, but more people need to be able to contribute across disciplines so the team becomes less dependent on specific individuals. Through multi-learning, where people learn from and with each other across specializations, the team gradually develops its collective capability.

This also changes what we need from leadership. Performance goals should be shared by the team, while individual goals should focus on learning and development. These goals need to reflect both personal ambitions and the capabilities the team needs to build. Sometimes that means deepening expertise, sometimes broadening it. Learning also needs to happen as part of everyday work.

Managers need to rethink how they follow up with individuals. If one-to-one conversations continue to focus on what each person has delivered, we risk recreating individual performance management alongside the team’s shared accountability. Managers still play an important role in supporting people’s growth, learning, and well-being, but they need to distinguish between team performance and individual development.

The Role Trap occurs when we build product teams around traditional specialist roles and continue to let those roles determine how work is divided, performance is measured, and skills are developed. Simply bringing people with different specializations together doesn’t make a team truly cross-functional. That starts when we design the team around its purpose and develop the ability to work and learn together.

More traps

The Negotiation Trap in Prioritization is one of several traps in the series Traps when moving from projects to product teams.

See the bigger picture

The classification trap in prioritization is one example of what can happen when we change the way we work without fully changing the underlying logic.

Our Project vs Product Organization in a Nutshell poster explores this shift from several perspectives including strategy, execution, governance, teams, funding, culture and organization.

Written by

NÀr vi bygger produktteam utifrÄn roller i stÀllet för den förmÄga teamet behöver

I en traditionell projekt- och linjeorganisation Àr arbetet ofta uppdelat efter specialistroller. Arkitekter ansvarar för arkitektur, utvecklare för utveckling och testare för testning. NÀr ett projekt ska bemannas identifierar vi vilka roller som behövs och hur mÄnga personer som krÀvs inom varje omrÄde. Arbetet fördelas mellan specialisterna och lÀmnas vidare i takt med att olika delar blir fÀrdiga.

Det Ă€r en naturlig logik nĂ€r arbetet kan delas upp i aktiviteter som planeras och följs upp var för sig. Vi utvecklar djup kompetens inom respektive omrĂ„de och lĂ„ter den som Ă€r bĂ€st lĂ€mpad utföra uppgiften. Även ledarskapet utgĂ„r ofta frĂ„n individen. Chefen sĂ€tter individuella prestationsmĂ„l, följer upp leveranser och ansvarar för medarbetarnas kompetensutveckling. Rollbeskrivningar, mĂ„l och uppföljning förstĂ€rker förvĂ€ntningarna pĂ„ vad var och en ska bidra med.

Men nÀr vi gÄr mot en produktorganisation behöver vi tÀnka annorlunda.

Vi vill bygga stabila, tvÀrfunktionella team som kan ta ansvar för en produkt och de effekter vi vill Ästadkomma. I komplex produktutveckling vet vi inte pÄ förhand vilka lösningar som kommer att fungera. Teamet behöver kunna utforska problem, prova idéer, fatta beslut och lÀra av resultatet. DÀrför behöver vi utgÄ frÄn uppdraget nÀr vi designar teamet. Vilka problem ska det kunna lösa? Vilka beslut behöver det kunna fatta? Vilken kompetens behöver finnas och vilken förmÄga behöver teamet utveckla för att nÄ sina mÄl utan onödiga beroenden?

Men det Àr hÀr vi riskerar att hamna i RollfÀllan.

NÀr vi skapar produktteam tar vi med oss rollerna frÄn projektorganisationen. Vi försöker fÄ med alla specialistroller som förekommer i utvecklingsprocessen, Àven om var och en bara bidrar med en liten del. Resultatet kan bli ett stort produktteam med mÄnga personer dÀr alla roller finns representerade, men dÀr förutsÀttningarna för gemensamt arbete Àr begrÀnsade. Vi har bemannat alla roller, men inte nödvÀndigtvis byggt den förmÄga teamet behöver.

NÀr vi utgÄr frÄn rollerna blir det ocksÄ lÀtt att lÄta dem styra hur arbetet fördelas. Arkitekten ansvarar för arkitekturen, utvecklaren för utvecklingen och testaren för testningen. NÀr utvecklaren Àr klar lÀmnas arbetet vidare till testaren. NÀr en arkitekturfrÄga uppstÄr vÀntar teamet pÄ arkitekten. Och nÀr testaren har fullt upp fortsÀtter kanske andra med nya uppgifter i stÀllet för att hjÀlpa till att fÄ det pÄgÄende arbetet fÀrdigt.

Vi har flyttat överlÀmningarna innanför teamets grÀnser, men inte fÄtt bort dem.

NÀr vi gÄr frÄn projektorganisation till produktteam riskerar vi att ta med oss samma specialistroller och överlÀmningar in i teamet, i stÀllet för att bygga ett mindre team med gemensam förmÄga att ta ansvar för utvecklingen frÄn ax till limpa.

Specialister blir flaskhalsar medan andra vÀntar eller pÄbörjar nytt arbete. Teamet blir sÄrbart nÀr nÄgon Àr frÄnvarande och kunskap koncentreras till enskilda personer. De individuella prestationsmÄlen kan dessutom förstÀrka problemet. Om utvecklaren bedöms utifrÄn sina leveranser och testaren utifrÄn sina tester blir det rationellt att prioritera de egna uppgifterna. Att hjÀlpa en kollega, lÀra sig nÄgot nytt eller lösa ett problem tillsammans kan dÄ konkurrera med det individen förvÀntas prestera.

Vi vill att teamet ska ta gemensamt ansvar för resultatet, men fortsÀtter att styra och följa upp individuella prestationer.

Det betyder inte att specialistkompetensen ska försvinna. TvÀrtom behöver vi djup kunskap inom olika omrÄden. Men teamets förmÄga Àr mer Àn summan av individernas specialistkunskaper. Inom LeSS anvÀnds begreppet generalizing specialists för personer som behÄller sin spetskompetens samtidigt som de breddar sin förmÄga. Alla behöver inte kunna allt, men fler behöver kunna bidra inom olika omrÄden sÄ att teamet blir mindre beroende av enskilda personer. Genom multi-learning, dÀr mÀnniskor lÀr av och tillsammans med varandra över specialistgrÀnserna, utvecklar teamet successivt sin gemensamma förmÄga.

Det stÀller ocksÄ andra krav pÄ ledarskapet. PrestationsmÄlen behöver vara gemensamma för teamet, medan individuella mÄl handlar om lÀrande och utveckling. De behöver ta hÀnsyn till bÄde personliga ambitioner och den förmÄga teamet behöver bygga. Ibland handlar det om att fördjupa en specialistkompetens, ibland om att bredda den. LÀrandet behöver ocksÄ vara en del av det dagliga arbetet.

Även chefens uppföljning behöver förĂ€ndras. Om individuella 1:1-samtal fortsĂ€tter att handla om vad varje person levererar riskerar vi att Ă„terskapa individuell styrning vid sidan av teamets gemensamma ansvar. Chefen har fortfarande en viktig roll i att stödja individens utveckling, lĂ€rande och vĂ€lmĂ„ende, men behöver skilja pĂ„ teamets prestation och individens utveckling.

RollfÀllan uppstÄr nÀr vi bygger produktteam utifrÄn traditionella specialistroller och fortsÀtter lÄta dessa styra hur arbetet fördelas, prestationer följs upp och kompetens utvecklas. Det Àr först nÀr vi utgÄr frÄn uppdraget och utvecklar förmÄgan att arbeta och lÀra tillsammans som vi börjar bygga ett verkligt tvÀrfunktionellt team.

Fler fÀllor

Det hÀr Àr en av flera fÀllor i en serie: FÀllor i övergÄngen frÄn projekt till produktteam.

Se helheten

KlassificeringsfÀllan i prioriteting Àr ett exempel pÄ vad som kan hÀnda nÀr vi förÀndrar vÄrt sÀtt att arbeta utan att fullt ut förÀndra den underliggande logiken.

VĂ„r poster Project vs Product Organization in a Nutshell belyser den hĂ€r förflyttningen ur flera perspektiv – bland annat strategi, genomförande, styrning, team, finansiering, kultur och organisation.

Written by

NÀr vi bygger produktteam men fortsÀtter optimera mÀnniskors belÀggning

I en traditionell projekt- och linjeorganisation Àr specialistkompetensen ofta organiserad i funktioner. Linjechefens uppgift Àr att matcha kompetens och kapacitet mot projektens behov. Arkitekter, kravanalytiker, utvecklare, testare och andra specialister fördelas mellan projekt, antingen pÄ deltid eller i tidsbegrÀnsade heltidsinsatser.

Det Àr en naturlig logik i den hÀr typen av organisation. Linjechefen förvÀntas tillhandahÄlla rÀtt kompetens vid rÀtt tillfÀlle och samtidigt hÄlla belÀggningen hög. Att optimera resursutnyttjandet blir en del av att göra ett bra jobb.

Men nÀr vi gÄr mot en produktorganisation vill vi Ästadkomma nÄgot annat.

I komplex produktutveckling vet vi inte pÄ förhand vilka lösningar som skapar önskad effekt. Vi behöver utforska, prova, fÄ feedback och lÀra. DÀrför vill vi skapa stabila, tvÀrfunktionella produktteam som kan ta ansvar för en produkt, arbeta tillsammans över tid och kontinuerligt fÄ vÀrdefullt arbete fÀrdigt. Stabilitet betyder inte att teamets sammansÀttning aldrig fÄr förÀndras, utan att teamet har den kontinuitet och gemensamma förmÄga som behövs för att ta ansvar och leverera vÀrde över tid.

Men det Àr hÀr vi riskerar att hamna i FragmenteringsfÀllan.

Vi skapar produktteam, men fortsÀtter fördela specialister mellan dem för att hÄlla den individuella belÀggningen hög.

FragmenteringsfÀllan i bemanning. Vi skapar produktteam men fortsÀtter dela mÀnniskors arbete mellan dem, parallellt eller i kortare perioder. PÄ papperet anvÀnder vi kapaciteten effektivt. I praktiken riskerar vi att förlora fokus, kontinuitet och flöde.

En arkitekt förvÀntas arbeta med arkitektur. NÀr det inte finns tillrÀckligt mycket arkitekturarbete i ett team delar vi personen med ett annat. En specialist som behövs först lÀngre fram lÄnas in under nÄgra veckor. Och nÀr behovet inom en viss roll tillfÀlligt minskar flyttar vi personen dit kompetensen för tillfÀllet efterfrÄgas.

Varje beslut kan verka förnuftigt. Vi anvÀnder begrÀnsad kompetens dÀr den behövs och undviker att nÄgon gÄr utan uppgifter. Men tillsammans Äterskapar besluten just den fragmentering som de stabila produktteamen var tÀnkta att komma bort frÄn.

NÀr mÀnniskor delar sin tid mellan flera team behöver de vÀxla mellan problem, prioriteringar och sammanhang. Forskning om task switching och attention residue visar att sÄdana vÀxlingar kan medföra omstÀllningskostnader och göra det svÄrare att behÄlla fokus.

Fragmenteringen skapar ocksÄ prioriteringskonflikter. Om en specialist arbetar i tvÄ team med varsin backlog, vem avgör vilket arbete som Àr viktigast? En fördelning pÄ 50 procent i vardera teamet löser inte den frÄgan. Den sÀger hur personens tid Àr tÀnkt att fördelas, men inte vilket arbete som ska prioriteras nÀr bÄda teamen behöver hjÀlp samtidigt. Den tar heller inte hÀnsyn till den tid och energi som gÄr Ät till att vÀxla mellan olika problem och sammanhang. Utan en gemensam prioritering riskerar individen att sjÀlv behöva avgöra vad som ska göras först eller förhandla mellan konkurrerande behov.

TidsbegrÀnsade heltidsinsatser skapar inte samma stÀndiga vÀxling mellan team. DÀremot kan kontinuiteten brytas nÀr en specialist flyttas vidare medan arbetet fortfarande pÄgÄr. Kunskap och sammanhang riskerar att gÄ förlorade, och nÀr flera team Àr beroende av samma mÀnniskor kan förseningar spridas mellan dem. Resultatet blir fler beroenden, mer pÄgÄende arbete och lÀngre ledtider.

Det betyder inte att specialistkompetens aldrig kan delas mellan team. TidsbegrÀnsade insatser kan vara vÀrdefulla, och vissa kompetenser kan behöva vara gemensamma. Skillnaden ligger i om insatserna stÀrker teamens förmÄga att ta ansvar för sitt arbete eller om teamen blir beroende av att mÀnniskor stÀndigt flyttas mellan dem.

HÀr ligger ocksÄ skillnaden mellan att optimera mÀnniskors individuella belÀggning och att optimera flödet av vÀrde genom organisationen. NÀr vi försöker hÄlla varje specialist fullt sysselsatt riskerar vi att skapa vÀntetider, konkurrerande prioriteringar och mer pÄgÄende arbete. Att alla har fullt upp betyder inte att organisationen fÄr mycket arbete fÀrdigt. TvÀrtom kan hög belÀggning i delar av systemet försÀmra flödet i helheten. Det Àr en central tanke i flödesprinciper och i Henrik Knibergs resonemang om Resource Utilization Trap.

En gemensam prioritering av arbetet kan minska konkurrerande behov mellan team. Men Àven om teamen arbetar mot samma prioriteringar kvarstÄr kostnaden för att mÀnniskor behöver vÀxla mellan olika sammanhang och att kontinuiteten bryts.

Det krÀver ocksÄ en förÀndring i ledarskapet. I projekt- och linjeorganisationen arbetar linjechefen till stor del i systemet, genom att matcha kompetens mot behov och fördela kapacitet utifrÄn befintliga strukturer. I produktorganisationen behöver ledarskapet i högre grad utveckla systemet, genom att skapa förutsÀttningar för stabila team och ett effektivt flöde av vÀrde.

FragmenteringsfÀllan uppstÄr nÀr vi bygger stabila produktteam men fortsÀtter optimera mÀnniskors individuella belÀggning. Vi hÄller mÀnniskor fullt sysselsatta, men riskerar samtidigt att göra det svÄrare för teamen att behÄlla fokus, arbeta tillsammans över tid och fÄ vÀrdefullt arbete fÀrdigt.

Fler fÀllor

Det hÀr Àr en av flera fÀllor i en serie: FÀllor i övergÄngen frÄn projekt till produktteam.

Se helheten

KlassificeringsfÀllan i prioriteting Àr ett exempel pÄ vad som kan hÀnda nÀr vi förÀndrar vÄrt sÀtt att arbeta utan att fullt ut förÀndra den underliggande logiken.

VĂ„r poster Project vs Product Organization in a Nutshell belyser den hĂ€r förflyttningen ur flera perspektiv – bland annat strategi, genomförande, styrning, team, finansiering, kultur och organisation.

Written by

NÀr kompetensen finns i teamet men inte nÀr den behövs

I en traditionell projekt- och linjeorganisation Àr specialistkompetensen ofta organiserad i funktioner och delas mellan flera projekt. NÀr ett projekt planeras uppskattar vi vilken kompetens som behövs, i vilken omfattning och vid vilken tidpunkt. En arkitekt kanske behövs pÄ 20 procent, en UX-designer pÄ 30 procent och en annan specialist pÄ heltid under nÄgra veckor lÀngre fram i projektet.

Det Àr en naturlig logik nÀr arbetet gÄr att förutse tillrÀckligt vÀl. Om vi pÄ förhand kan beskriva vad som ska göras och ungefÀr nÀr olika kompetenser behövs, kan vi ocksÄ planera mÀnniskors insatser. Specialister kan bidra vid rÀtt tillfÀlle utan att vara knutna till ett projekt pÄ heltid.

Men i komplex produktutveckling vet vi inte pÄ förhand vilka lösningar som kommer att skapa önskad effekt. Vi behöver prova oss fram, fÄ feedback och lÄta det vi lÀr oss pÄverka vad vi gör hÀrnÀst. Vi vet ofta vilka kompetenser som sannolikt behövs, men inte vilka frÄgor som kommer att uppstÄ eller vilka perspektiv och beslut som kommer att behövas lÀngs vÀgen.

NÀr vi inte lÀngre utgÄr frÄn en fÀrdig lösning som olika specialister ska bidra till att genomföra fÄr kompetensen en annan roll. Teamet behöver tillsammans upptÀcka och utveckla lösningen. En specialist bidrar inte bara med en viss insats, utan ocksÄ med perspektiv som pÄverkar hur teamet förstÄr problemet, vilka möjligheter det ser och vad det vÀljer att prova. Arkitekten behövs inte bara nÀr ett arkitekturbeslut ska fattas och UX-kompetensen inte bara nÀr nÄgot ska designas.

Det Àr en av anledningarna till att vi bygger stabila, tvÀrfunktionella produktteam. Olika kompetenser behöver kunna mötas medan förstÄelsen och lösningen vÀxer fram. Teamet behöver kunna utforska frÄgor tillsammans och fatta beslut nÀr de behövs.

Men det Àr hÀr vi riskerar att hamna i TillgÀnglighetsfÀllan.

Vi identifierar vilka kompetenser produktteamet behöver men fortsÀtter planera deras medverkan som om vi pÄ förhand kunde veta nÀr de behövs. Vi bemannar teamet med 20 procent av en specialist, 30 procent av en annan och kanske en tredje pÄ heltid under nÄgra veckor. PÄ organisationsbilden ser teamet tvÀrfunktionellt ut. Men bemanningsplanen sÀger inget om huruvida rÀtt kompetenser kan mötas nÀr frÄgorna faktiskt uppstÄr.

TillgÀnglighetsfÀllan. Teamet har alla kompetenser pÄ organisationsbilden, men nÀr frÄgor uppstÄr och beslut ska fattas Àr inte alla tillgÀngliga. Det kan leda till vÀntan, men ocksÄ till att teamet gÄr vidare utan perspektiv som hade kunnat förÀndra bÄde problemförstÄelsen och lösningen.

I praktiken kanske en specialist vars perspektiv behövs arbetar i ett annat team. De kompetenser som behöver mötas Àr kanske inte tillgÀngliga samtidigt, eller sÄ finns mandatet för ett beslut hos nÄgon som inte Àr dÀr. Teamet fÄr vÀnta och samordna.

Det gÀller Àven nÀr nÄgon arbetar heltid i teamet under en begrÀnsad period. Att en specialist finns tillgÀnglig under tre veckor hjÀlper inte om den avgörande frÄgan uppstÄr veckan efter. Vi kan ha planerat insatsen helt enligt plan och ÀndÄ sakna kompetensen nÀr den behövs.

Men ibland uppstÄr ett problem som Àr svÄrare att upptÀcka. Teamet gÄr vidare utan ett perspektiv som hade kunnat förÀndra bÄde förstÄelsen av problemet och valet av lösning. Ingen mÀrker vad som saknades, eftersom ingen visste att kompetensen skulle behövas just dÄ.

Det betyder inte att all specialistkompetens mÄste finnas pÄ heltid i varje team. Viss expertis kan delas mellan flera team. Men ju oftare en kompetens behöver bidra, ju svÄrare det Àr att förutse nÀr den behövs och ju viktigare dess perspektiv Àr för teamets arbete, desto svÄrare blir det att hantera den som en insats som kan planeras in vid vissa tillfÀllen. Detsamma gÀller mandat för beslut som teamet Äterkommande behöver kunna fatta.

Även ledarskapet behöver förĂ€ndras. I stĂ€llet för att frĂ€mst planera nĂ€r olika specialister ska utföra sina uppgifter behöver ledare se till att teamet kan dra nytta av deras kompetens nĂ€r frĂ„gorna uppstĂ„r. Det handlar inte om att alla ska vara tillgĂ€ngliga hela tiden, utan om att teamet ska kunna utforska problem, utveckla lösningar och fatta beslut utan att varje specialistinsats mĂ„ste planeras i förvĂ€g.

TillgÀnglighetsfÀllan uppstÄr nÀr vi bygger tvÀrfunktionella produktteam men fortsÀtter planera tillgÄngen till kompetens och mandat som om vi pÄ förhand kunde veta nÀr de kommer att behövas. Vi har bemannat teamet med rÀtt kompetenser pÄ papperet, men inte skapat förutsÀttningarna för att de ska kunna bidra nÀr det verkligen behövs.

Fler fÀllor

Det hÀr Àr en av flera fÀllor i en serie: FÀllor i övergÄngen frÄn projekt till produktteam.

Se helheten

KlassificeringsfÀllan i prioriteting Àr ett exempel pÄ vad som kan hÀnda nÀr vi förÀndrar vÄrt sÀtt att arbeta utan att fullt ut förÀndra den underliggande logiken.

VĂ„r poster Project vs Product Organization in a Nutshell belyser den hĂ€r förflyttningen ur flera perspektiv – bland annat strategi, genomförande, styrning, team, finansiering, kultur och organisation.

Written by

In a project and line organization, responsibility is often divided across functions, departments and managers. Each has its own goals, budget and responsibilities, and projects are set up to deliver initiatives that cut across the organization.

When there is not enough capacity to do everything, different needs have to be weighed against each other. Negotiation naturally becomes part of prioritization. Each person represents their area and makes the case for what matters there.

This customer is waiting.
We have already promised this.
We need to address this risk.
This is critical to our revenue.

These can all be perfectly reasonable arguments. They reflect the responsibilities people have actually been given.

As we move towards outcome-driven steering and stable cross-functional product teams, the logic starts to change. Instead of bringing people together temporarily around different initiatives, we have stable capacity that can be used to create change over time. And outcomes such as increased customer loyalty, shorter lead times or better quality rarely fit neatly within organizational boundaries.

The question is therefore no longer primarily who should get resources for their initiative, but which outcome matters most right now and should get our limited capacity.

But the old logic can remain.

We can have stable cross-functional teams and Epics that describe desired outcomes, while different parts of the organization continue to compete for the teams’ capacity.

We have changed the structure around prioritization, but prioritization itself is still a negotiation between organizational interests.

The structure can change from projects to product teams while prioritization remains a negotiation between organizational interests. The shift is towards making priorities from a shared view of what matters most to the organization and its strategic direction.

When each alternative is argued from a different perspective, they also become difficult to compare. One case is made in terms of customer value, another in terms of revenue and a third in terms of risk. They may all be important, but they are being judged by different measures.

Without a shared basis for the decision, something else eventually has to settle it. It may be what has already been promised, who makes the strongest case or who has the most influence.

Or HiPPO: Highest Paid Person’s Opinion.

The real problem is not HiPPO. The problem is that we have created a prioritization system in which we need a HiPPO to move forward.

To make priorities across the organization, we need a shared basis for our decisions. A clear strategic ambition provides direction, but it is not always enough. Several possible outcomes may contribute to the same ambition, so we still need a way to decide what should take priority.

Strategic contribution, expected outcome, time criticality, risk and the capacity required may all matter. The challenge is to consider them together and compare the alternatives relative to each other, rather than having each part of the organization make its case using its own criteria.

There is a lot we can learn here from the economic thinking behind approaches such as Cost of Delay. The point is not to find a formula that gives us the right answer, but to create a better basis for weighing different perspectives and alternatives against each other.

That is The Negotiation Trap in Prioritization: we have moved from projects to product teams and started describing the outcomes we want to achieve, but different parts of the organization are still negotiating over the same limited capacity.

The shift is from negotiating between local interests to making shared priorities based on what matters most for the organization as a whole.

More traps

The Negotiation Trap in Prioritization is one of several traps in the series Traps when moving from projects to product teams.

See the bigger picture

The negotiation trap in prioritization is one example of what can happen when we change the way we work without fully changing the underlying logic.

Our Project vs Product Organization in a Nutshell poster explores this shift from several perspectives including strategy, execution, governance, teams, funding, culture and organization.

Written by

I en projekt- och linjeorganisation Àr ansvar ofta fördelat mellan funktioner, avdelningar och chefer. Varje del har sina mÄl, sin budget och sitt ansvar, och projekt startas för att

genomföra olika initiativ tvÀrs över organisationen.

NÀr resurserna inte rÀcker till allt behöver olika behov vÀgas mot varandra. DÄ blir förhandling en ganska naturlig del av prioriteringen. Varje ansvarig företrÀder sitt omrÄde och argumenterar för det som Àr viktigt dÀr.

Den hÀr kunden vÀntar.
Det hÀr har vi redan lovat.
Den hÀr risken mÄste vi hantera.
Det hÀr Àr avgörande för vÄra intÀkter.

Argumenten kan vara helt rimliga. De speglar det ansvar mÀnniskor faktiskt har fÄtt.

NÀr vi gÄr mot effektstyrning och stabila tvÀrfunktionella produktteam förÀndras förutsÀttningarna. I stÀllet för att samla mÀnniskor kring olika initiativ har vi en stabil kapacitet som kan anvÀndas för att Ästadkomma förflyttningar över tid. Och effekter som ökad kundlojalitet, kortare ledtider eller bÀttre kvalitet följer sÀllan organisationens grÀnser.

FrÄgan blir dÀrför inte i första hand vem som ska fÄ resurser till sitt initiativ, utan vilken förflyttning som Àr viktigast att Ästadkomma nu och dÀrför ska fÄ vÄr begrÀnsade kapacitet.

Men den gamla logiken kan leva kvar.

Vi kan ha stabila tvÀrfunktionella team och Epics som beskriver önskade förflyttningar, samtidigt som olika delar av organisationen fortsÀtter konkurrera om teamens kapacitet.

Vi har förÀndrat strukturen runt prioriteringen, men sjÀlva prioriteringen Àr fortfarande en förhandling mellan organisatoriska intressen.

NÀr varje alternativ dessutom motiveras utifrÄn sitt eget perspektiv blir de svÄra att jÀmföra. Det ena argumentet handlar om kundvÀrde, det andra om intÀkter och det tredje om risk. Alla kan vara viktiga, men de bedöms utifrÄn olika mÄttstockar.

Om vi saknar en gemensam grund för beslutet mÄste nÄgot annat till slut avgöra. Det kan vara det som redan har lovats, den som argumenterar bÀst eller den som har mest makt.

Eller HiPPO: Highest Paid Person’s Opinion.

Problemet Àr inte egentligen HiPPO. Problemet Àr att vi har skapat ett prioriteringssystem dÀr vi behöver en HiPPO för att komma vidare.

För att prioritera för helheten behöver vi en gemensam grund för vÄra beslut. En tydlig strategisk ambition ger riktning, men den rÀcker inte alltid. Flera möjliga förflyttningar kan bidra till samma ambition och dÄ behöver vi ocksÄ kunna avgöra vad som ska fÄ en förflyttning att gÄ före en annan.

Det kan handla om strategiskt bidrag, förvÀntad effekt, tidskritikalitet, risk eller hur mycket kapacitet nÄgot krÀver. Utmaningen Àr att vÀga perspektiven tillsammans och jÀmföra alternativen relativt varandra, snarare Àn att lÄta varje del av organisationen argumentera utifrÄn sin egen mÄttstock.

HÀr finns mycket att hÀmta i det ekonomiska tÀnkandet bakom exempelvis Cost of Delay. PoÀngen Àr inte att hitta en formel som ger oss det rÀtta svaret, utan att hjÀlpa oss vÀga olika perspektiv och alternativ mot varandra.

Det Àr FörhandlingsfÀllan i prioritering: vi har gÄtt frÄn projekt till produktteam och börjat formulera önskade förflyttningar, men lÄter fortfarande olika delar av organisationen förhandla om den begrÀnsade kapaciteten.

Förflyttningen Àr frÄn att förhandla mellan lokala intressen till att tillsammans prioritera det som Àr viktigast för helheten.

Fler fÀllor

Det hÀr Àr en av flera fÀllor i en serie: FÀllor i övergÄngen frÄn projekt till produktteam.

Se helheten

KlassificeringsfÀllan i prioriteting Àr ett exempel pÄ vad som kan hÀnda nÀr vi förÀndrar vÄrt sÀtt att arbeta utan att fullt ut förÀndra den underliggande logiken.

VĂ„r poster Project vs Product Organization in a Nutshell belyser den hĂ€r förflyttningen ur flera perspektiv – bland annat strategi, genomförande, styrning, team, finansiering, kultur och organisation.

Written by

NĂ€r vi gĂ„r frĂ„n att organisera arbete i projekt till att arbeta i produktteam förĂ€ndras inte bara organisationsformen. Även logiken för hur vi prioriterar, planerar, organiserar och följer upp arbetet behöver förĂ€ndras.

Det Àr lÀtt att byta sprÄk och strukturer utan att förÀndra den underliggande logiken. Krav blir Epics, projektplaner blir Product Backlogs och vi inför nya sÀtt att visualisera arbetet, samtidigt som vi fortsÀtter fatta beslut och styra ungefÀr som tidigare.

PÄ ytan kan mycket alltsÄ se annorlunda ut, medan gamla sÀtt att tÀnka lever kvar. Vi bestÀmmer fortfarande lösningar tidigt, klassificerar vad som ska fÄ plats i projektets scope, bryter ner redan bestÀmda lösningar i mindre delar, lÄter nÄgra fÄ planera Ät mÄnga och följer upp om det planerade arbetet blir gjort.

SprÄket har förÀndrats. Strukturerna har förÀndrats. Men logiken bakom hur vi styr och organiserar arbetet Àr densamma.

Det hÀr fÀllor som jag Äterkommande ser i den förflyttningen.

FÀllaProjektlogikenFörflyttningenFÀllan
LösningsfÀllan i prioriteringVi prioriterar vilka krav och lösningar som ska ingÄ i projektet.Prioritera vilken förflyttning vi vill Ästadkomma innan vi vÀljer vad vi ska bygga.Vi byter krav mot Epics, men fortsÀtter prioritera vad vi ska bygga.
KlassificeringsfÀllan i prioriteringVi klassificerar vad som mÄste, bör eller kan ingÄ i projektets scope.Prioritera mellan förflyttningarna och vÀlj vilken som ska fÄ fokus nu.Vi klassificerar varje Epic som exempelvis High, Medium eller Low, men vÀljer inte vad som ska gÄ först.
FörhandlingsfÀllan i prioriteringOlika delar av organisationen driver sina behov och vi förhandlar om vad som ska fÄ plats.Prioritera tillsammans utifrÄn vad som Àr viktigast för helheten.Vi samlar arbetet i en gemensam backlog, men fortsÀtter prioritera genom förhandling mellan olika delar av organisationen.
NedbrytningsfÀllanVi bryter ner en bestÀmd lösning i mindre delar som tillsammans ska byggas.UtgÄ frÄn den önskade förflyttningen och bygg en liten fungerande slice. AnvÀnd feedback för att se om vi rör oss i rÀtt riktning och lÄt lÀrandet styra vad vi bygger hÀrnÀst.Vi kallar helheten Epic och delarna Stories men bryter fortfarande ner en redan bestÀmd hel lösning.
EffektivitetsfÀllan i planeringNÄgra fÄ planerar arbetet Ät mÄnga för att anvÀnda mÀnniskors tid effektivt.LÄt de relevanta perspektiven mötas nÀr besluten behöver fattas och kunskapen finns.Projektplanen blir en detaljerad backlog och nÄgra fÄ tÀnker fortfarande Ät mÄnga lÄngt i förvÀg.
KontrollfÀllanVi organiserar arbetet i en plan och följer upp att det blir gjort.Organisera kring önskade effekter och anvÀnd transparensen för att se vad arbetet leder till, vad vi lÀr oss och vad vi behöver göra hÀrnÀst.Vi byter projektplanen mot produktstrukturer, men anvÀnder dem fortfarande för att organisera och följa upp arbetet.
TillgÀnglighetsfÀllanVi planerar vilka specialister som behövs, hur mycket och nÀr.Se till att kompetens och mandat finns tillgÀngliga nÀr teamet behöver utforska och fatta beslut.Vi bemannar teamet med rÀtt kompetenser pÄ papperet, men de Àr inte tillgÀngliga nÀr de behövs.
FragmenteringsfÀllan i bemanningVi fördelar mÀnniskor mellan projekt för att hÄlla den individuella belÀggningen hög.Skapa stabila team med fokus och kontinuitet som kan leverera vÀrde över tid.Vi bygger produktteam, men fortsÀtter dela mÀnniskor mellan dem för att maximera deras belÀggning.
RollfÀllan i teamdesignVi organiserar mÀnniskor efter specialistroller och fördelar arbetet mellan dem.Bygg team med gemensamt ansvar för produkten, dÀr kompetenserna samverkar för att skapa vÀrde.Vi samlar rÀtt specialistkompetenser i ett team, men fortsÀtter dela upp arbetet och ansvaret mellan rollerna.

Det som förenar fÀllorna Àr att vi kan förÀndra strukturerna utan att förÀndra tankesÀttet bakom dem. Vi kan kalla nÄgot en Epic och fortfarande behandla den som ett stort krav. Vi kan ha en Product Backlog och fortfarande anvÀnda den som en projektplan. Vi kan ha produktteam och fortfarande bestÀmma vad de ska göra lÄngt i förvÀg.

Att gÄ över till produktteam betyder inte att vi slutar planera, formulera krav, leverera eller synliggöra arbetet. Det som förÀndras Àr vad vi anvÀnder dessa saker till.

Utmaningen Àr inte att införa nya strukturer. Det Àr att upptÀcka nÀr vi anvÀnder dem för att fortsÀtta arbeta enligt samma gamla projektlogik.

Se helheten

Förflyttningen frÄn projekt till produktteam pÄverkar fler delar av organisationen, bland annat strategi, styrning, finansiering, team, kultur och organisationsstruktur.

VÄr poster Project vs Product Organization in a Nutshell visar den större förflyttningen ur flera perspektiv.

Written by

When we move from organizing work in projects to working in product teams, it is not only the organizational structure that changes. The logic behind how we prioritize, plan, organize, and track the work also needs to change.

It is easy to change the language and structures without changing the underlying logic. Requirements become Epics, project plans become Product Backlogs, and new ways of visualizing the work are introduced, while we continue to make decisions and manage the work much as we did before.

From the outside, the organization may look very different. But underneath, familiar assumptions can remain. We still decide solutions early, classify what should fit into scope, break predefined solutions into smaller pieces, let a few people plan for everyone else, and track whether the planned work gets done.

The terminology has changed. The structures have changed. But the logic for managing the work has not.

These are traps I repeatedly see in that shift.

TrapProject logicThe shiftThe trap
The Solution Prioritization TrapWe prioritize which requirements and solutions should be included in the project.Prioritize the outcome we want to achieve before prioritizing what to build.We may replace requirements with Epics, but we continue to prioritize what to build.
The Classification Trap in PrioritizationWe classify what must, should, or could be included in the project scope.Compare the desired outcomes and decide which one should get our focus now.We classify each Epic as High, Medium, or Low, but do not decide what should come first.
The Negotiation Trap in PrioritizationWe prioritize from different parts of the organization’s perspectives and negotiate what gets capacity.Prioritize together based on what matters most for the whole.We bring the work together in one shared backlog, but continue to prioritize through negotiation between different parts of the organization.
The Work Breakdown TrapWe break down a predefined solution into smaller parts that together need to be built.Start from the desired outcome and build a small, working slice. Use feedback to see whether we are moving in the right direction, and let learning guide what we build next.We call the whole an Epic and the parts Stories, but we are still breaking down a predefined solution.
The Planning Efficiency TrapA few people plan the work for everyone else in an effort to use people’s time efficiently.Bring the relevant perspectives together when decisions need to be made and the knowledge is available.The project plan becomes a detailed backlog, but a few people are still doing the thinking for everyone else, far in advance.
The Control TrapWe organize the work in a plan and track whether it gets done.Organize around desired outcomes and use transparency to see what the work leads to, what we are learning, and what we need to do next.We replace the project plan with product structures, but still use them to organize and track the work.
The Availability trapWe plan which specialists are needed, how much of their time is required, and when.Make expertise and decision-making authority available when teams need to explore problems and make decisions.We staff teams with the right expertise on paper, but it isn’t available when needed.
The Fragmentation Trap in StaffingWe allocate people across projects to keep individual utilization high.Build stable teams with the focus and continuity needed to deliver value over time.We create product teams but continue to split people’s time across them to maximize individual utilization.
The Role Trap in Team DesignWe organize people by specialist roles and distribute work among them.Build teams with shared ownership of the product, where different skills come together to deliver value.We bring different specialist expertise into one team but continue to divide work and responsibility along role boundaries.

What connects these traps is the risk of changing the visible structures without changing the assumptions behind them. We can call something an Epic and still treat it as a large requirement. We can have a Product Backlog and still use it as a project plan. We can have product teams and still decide their work far in advance.

Moving to product teams does not mean that planning, requirements, delivery or making work visible no longer matter. It changes what we use them for.

The challenge is not adopting the structures of product teams. It is recognizing when we are using those structures to reproduce the logic of projects.

See the bigger picture

These traps focus on how we organize and manage work. The move from projects to product teams affects many other parts of the organization as well, including strategy, governance, funding, teams, culture and organizational structure.

Our Project vs Product Organization in a Nutshell poster explores this broader shift from several perspectives.

Written by

I en projektorganisation sker prioritering ofta i samband med att vi bestÀmmer vad som ska ingÄ i ett projekt. Vi har krav, funktioner eller lösningar och behöver avgöra vad som ska fÄ plats inom en begrÀnsad tid och budget.

Ett naturligt sÀtt att göra det Àr att klassificera innehÄllet: High, Medium eller Low, Must, Should eller Could. Det hjÀlper oss att skilja det som mÄste ingÄ i leveransen frÄn sÄdant vi kan avstÄ frÄn om tiden eller pengarna inte rÀcker. Flera saker kan vara High eller Must samtidigt. Det Àr inget konstigt med det. Vi försöker framför allt avgöra vad som ska ingÄ i det scope vi planerar att leverera.

NÀr vi organiserar utvecklingen kring produktteam förÀndras frÄgan. Vi arbetar mot önskade effekter och behöver avgöra vilken förflyttning som Àr viktigast att fokusera pÄ nu.

Det krÀver nÄgon form av gemensam grund för vÄra val. Strategisk betydelse kan spela in, liksom förvÀntad effekt, tidskritikalitet, risk och hur mycket kapacitet nÄgot krÀver. Exakt vilka principer vi anvÀnder Àr mindre viktigt Àn att vi Àr överens om dem innan vi börjar argumentera för vÄra egna förflyttningar.

Prioritering uppstÄr egentligen först nÀr alternativen stÀlls mot varandra. Vad hÀnder om vi vÀntar med den ena medan vi gör den andra? Vad kostar det oss att vÀnta? Vad fÄr vi genom den ordning vi vÀljer, och vad vÀljer vi samtidigt att skjuta pÄ? Det Àr samma typ av ekonomiskt resonemang som ligger bakom exempelvis Cost of Delay och Weighted Shortest Job First.

Men nÀr vi gÄr frÄn att organisera utvecklingen i projekt till att arbeta i produktteam följer ofta ett vÀlbekant sÀtt att prioritera med oss. Kraven och lösningarna har kanske ersatts av Epics som beskriver önskade förflyttningar, men vi fortsÀtter att prioritera dem pÄ ett vÀlbekant sÀtt:

Öka kundlojaliteten: High.
Minska tiden för onboarding: High.
Minska Äterkommande produktionsincidenter: High.
Öka sjĂ€lvservicen: Medium.

Det ser ut som att vi har prioriterat vÄra förflyttningar. Men vilken ska vi fokusera pÄ först?

KlassificeringsfÀllan uppstÄr nÀr vi gÄr frÄn projektbaserad utveckling till produktteam men behÄller den gamla prioriteringslogiken och klassificerar hur viktig varje Epic Àr istÀllet för att prioritera mellan dem.

NÀr varje Epic bedöms för sig Àr det lÀtt att nÀstan allt blir High. Kundlojaliteten Àr avgörande för affÀren, problemen i onboarding gör att vi tappar kunder och produktionsincidenterna kostar pengar och skapar frustration. SjÀlvservice kan samtidigt frigöra betydande kapacitet. Alla har bra argument, och om Low i praktiken riskerar att betyda inte nu och kanske aldrig finns det starka incitament att Ätminstone hamna pÄ Medium, helst High.

Efter ett tag har vi kanske fem High, tre Medium och en Low. Vi har lagt mycket tid pÄ prioritering, men fortfarande inte bestÀmt vad som ska gÄ först.

Vi har klassificerat hur viktiga saker Àr. Vi har inte prioriterat mellan dem.

En rak prioriteringsordning, eller stack ranking, tvingar fram ett annat beslut. Inte för att siffrorna 1, 2 och 3 Àr bÀttre etiketter, utan för att nÄgot faktiskt mÄste gÄ före nÄgot annat. Om nÄgot flyttas upp behöver nÄgot annat flyttas ner.

TvÄ saker kan bÄda vara High. De kan inte bÄda vara först.

Det betyder inte att ordningen blir en ny plan för framtiden. NÀr vi lÀr oss mer, uppnÄr effekter eller förutsÀttningarna förÀndras kan ocksÄ ordningen förÀndras. Den visar helt enkelt vÄrt bÀsta beslut just nu om var vi ska lÀgga vÄr begrÀnsade kapacitet.

KlassificeringsfÀllan i prioritering uppstÄr nÀr vi prioriterar varje Epic för sig, nÀr vi egentligen behöver prioritera mellan dem.

Fler fÀllor

Det hÀr Àr en av flera fÀllor i en serie: FÀllor i övergÄngen frÄn projekt till produktteam

Se helheten

KlassificeringsfÀllan i prioriteting Àr ett exempel pÄ vad som kan hÀnda nÀr vi förÀndrar vÄrt sÀtt att arbeta utan att fullt ut förÀndra den underliggande logiken.

VĂ„r poster Project vs Product Organization in a Nutshell belyser den hĂ€r förflyttningen ur flera perspektiv – bland annat strategi, genomförande, styrning, team, finansiering, kultur och organisation.

Written by

In a project organization, prioritization often happens when we decide what should be included in a project. We have requirements, features, or solutions and need to determine what can fit within a limited timeframe and budget.

A natural way to do this is to classify the work: High, Medium, or Low, Must, Should, or Could. This helps us distinguish what needs to be part of the delivery from what we can leave out if time or money runs short. Several things can be High or Must at the same time. There is nothing strange about that. We are primarily trying to decide what should be included in the scope we plan to deliver.

When we organize development around product teams, the question changes. We work towards desired outcomes and need to decide which outcome matters most right now and where to focus our capacity.

To make that choice, we need some shared principles for prioritization. Strategic importance may matter, as well as expected impact, time criticality, risk, or how much capacity something requires. The exact principles matter less than agreeing on them before we start arguing for the things we each care about most.

Prioritization really begins when we compare alternatives. What happens if we delay one while pursuing another? What does waiting cost us? What do we gain from the order we choose, and what do we postpone as a result? This is the kind of economic thinking behind approaches such as Cost of Delay and Weighted Shortest Job First.

But when we move from organizing development in projects to working in product teams, a familiar way of prioritizing often comes with us. Requirements and solutions may have been replaced by Epics describing desired outcomes, but we continue to prioritize them in much the same way:

Increase customer loyalty: High.
Reduce onboarding time: High.
Reduce recurring production incidents: High.
Increase self-service: Medium.

It looks like we have prioritized our Epics. But which one should we focus on first?

The classification trap occurs when we move from project-based development to product teams but keep the old prioritization logic, classifying how important each Epic is instead of prioritizing between them.

When each Epic is assessed on its own, it is easy for almost everything to become High. Customer loyalty is critical to the business, onboarding problems are causing us to lose customers, and production incidents cost money and create frustration. Self-service could free up significant capacity. They all have good arguments. And if Low effectively means not now and perhaps never, there is a strong incentive to make sure your own Epic is at least Medium, preferably High.

Before long, we may have five Highs, three Mediums, and one Low. We have spent a lot of time prioritizing, but we still haven’t decided what should come first.

We have classified how important things are. We haven’t prioritized between them.

A clear priority order, or stack ranking, forces a different decision. Not because 1, 2, and 3 are better labels than High, Medium, and Low, but because something actually has to come before something else. If one thing moves up, another has to move down.

Two things can both be High. They cannot both be first.

This does not mean the order becomes a new plan for the future. As we learn more, achieve outcomes, or circumstances change, the order can change too. It simply represents our best decision right now about where to focus our limited capacity.

The Classification Trap in Prioritization occurs when we prioritize each Epic on its own, when what we really need to do is prioritize between them.

More traps

The Negotiation Trap in Prioritization is one of several traps in the series Traps when moving from projects to product teams.

See the bigger picture

The classification trap in prioritization is one example of what can happen when we change the way we work without fully changing the underlying logic.

Our Project vs Product Organization in a Nutshell poster explores this shift from several perspectives including strategy, execution, governance, teams, funding, culture and organization.

Written by

I en projektorganisation definierar vi vad som ska levereras, organiserar arbetet och följer upp hur det gÄr. Scope bryts ner, aktiviteter planeras och status rapporteras. Vi kan se vad som Àr gjort, vad som ÄterstÄr och om leveransen följer planen.

NÀr vi gÄr mot produktutveckling förÀndras mÄlet. Vi försöker inte lÀngre slutföra en pÄ förhand definierad mÀngd arbete, utan Ästadkomma en förflyttning; en effekt för kunder, anvÀndare eller verksamheten. DÄ förÀndras ocksÄ vad vi behöver styra och följa upp.

Vi behöver fortfarande förstÄ vad som pÄgÄr, vad vi lÀgger vÄr kapacitet pÄ och vad som hindrar oss. Men det utförda arbetet Àr inte lÀngre det primÀra mÄttet pÄ framsteg.

Det rÀcker inte att veta vad vi har gjort. Vi behöver veta vad det har lett till.

ÄndĂ„ Ă€r det förvĂ„nansvĂ€rt lĂ€tt att införa produktbackloggar, Epics, Stories, Tasks och tavlor och samtidigt ta med sig den gamla logiken. Projektplanen har försvunnit, men frĂ„gorna Ă€r nĂ€stan desamma: Vad Ă€r klart? Vad Ă„terstĂ„r? Hur mycket har vi levererat? Följer vi planen?

Mer av arbetet har blivit synligt, men vi anvÀnder fortfarande strukturen framför allt för att följa arbetet och kontrollera vad som blir gjort.

HÀr finns en viktig skillnad mellan transparens och kontroll. I produktutveckling gör vi arbetet synligt för att de som arbetar med och finansierar produkten ska kunna förstÄ vad som hÀnder, samordna sig, skapa lÀrande och fatta bÀttre beslut om vad som Àr klokt att göra hÀrnÀst.

Samma transparens kan anvÀndas för tvÄ helt olika syften: för att kontrollera arbetet eller för att styra mot effekt.

Kontrollogiken blir sÀrskilt synlig nÀr vi försöker ge allt arbete en plats i strukturen. Det kommer alltid att finnas underhÄll, support, mindre rÀttningar, tekniskt arbete och annat som behöver hanteras, utan att det direkt kommer ur de förflyttningar vi har valt att Ästadkomma.

HÀr Àr det lÀtt att börja anvÀnda Epics till nÄgot de inte Àr avsedda för: som behÄllare för olika typer av arbete. UnderhÄllsuppgifter samlas kanske i en Epic som heter UnderhÄll, supportuppgifter i Support. Backloggen ser prydlig ut och allt har fÄtt sin plats.

Men dÄ har vi ocksÄ tappat sjÀlva poÀngen med en Epic. Vad innebÀr det egentligen att prioritera UnderhÄll högre Àn Support? Enskilda uppgifter kan vara mer eller mindre viktiga, men behÄllarna beskriver inga förflyttningar vi kan vÀlja mellan. De blir heller aldrig klara, eftersom nytt arbete hela tiden fylls pÄ.

En Epic Àr inte en behÄllare för arbete. Den representerar en förflyttning vi vill Ästadkomma.

Minska Äterkommande produktionsincidenter med 50 procent kan till exempel vara en Epic som beskriver en intern förbÀttring. FÄ dubbelt sÄ mÄnga förstagÄngskunder att komma tillbaka inom en mÄnad kan vara en annan, med en mer direkt effekt för kunden och verksamheten. BÄda beskriver förflyttningar som vi kan prioritera mot andra förflyttningar, arbeta mot, mÀta och sÄ smÄningom uppnÄ.

Vissa underhÄllsuppgifter kanske bidrar till den första Epicen, andra gör det inte. Allt kan ÀndÄ vara synligt i produktbackloggen. En Task behöver inte en Epic bara för att ha nÄgonstans att höra hemma.

I förflyttningen frĂ„n projekt till produkt kan vi byta struktur utan att Ă€ndra den underliggande logiken – och anvĂ€nda en produktbacklogg för att organisera arbetet i en plan, i stĂ€llet för att organisera kring önskade effekter och synliggöra arbetet och lĂ€randet lĂ€ngs vĂ€gen.

Skillnaden mellan att följa upp arbete och att styra mot effekt blir kanske allra tydligast nÀr vi upptÀcker att vi inte behöver göra allt vi trodde.

Anta att vi tror att tio saker behövs för att skapa en viss effekt. Vi gör tre, mÀter vad som hÀnder och upptÀcker att effekten redan Àr uppnÄdd.

Om vi följer upp arbetet ser vi sju saker som ÄterstÄr. Om vi följer upp effekten har vi upptÀckt sju saker som vi inte behöver göra.

Samma verklighet. Helt olika syn pÄ framsteg.

Vi behöver inte heller kÀnna till eller strukturera allt arbete i förvÀg. Incidenter, supportÀrenden och annat oplanerat arbete kommer att ta kapacitet utan att vi vet exakt vad det blir. Vi kan lÀmna utrymme för det och synliggöra arbetet nÀr det uppstÄr. Och allt behöver inte bli en entitet i backloggen, bara för att arbetet gÄr att följa upp betyder det inte att det Àr vÀrdefullt att göra det.

Vi behöver alltsÄ fortfarande förstÄ arbetet, kapaciteten och vad som hÀnder. Men vi behöver inte bygga vÄr styrning kring att kontrollera att arbetet blir gjort.

KontrollfÀllan uppstÄr nÀr vi inför produktutvecklingens strukturer och transparens men fortsÀtter anvÀnda dem med projektlogikens fokus pÄ scope, leverans och genomfört arbete och blir bÀttre pÄ att följa upp vad vi gör Àn pÄ att förstÄ vad vi Ästadkommer.

Fler fÀllor

Det hÀr Àr en av flera fÀllor i en serie: FÀllor i övergÄngen frÄn projekt till produktteam

Se helheten

KontrollfÀllan Àr ett exempel pÄ vad som kan hÀnda nÀr vi förÀndrar vÄrt sÀtt att arbeta utan att fullt ut förÀndra den underliggande logiken.

VĂ„r poster Project vs Product Organization in a Nutshell belyser den hĂ€r förflyttningen ur flera perspektiv – bland annat strategi, genomförande, styrning, team, finansiering, kultur och organisation.

Written by

In a project organization, we define what needs to be delivered, organize the work and follow its progress. Scope is broken down, activities are planned and status is reported. We can see what has been done, what remains and whether delivery is following the plan.

When we move towards product development, the goal changes. We are no longer trying to complete a predefined body of work, but to create a change; an effect for customers, users or the business. And that changes what we need to steer towards and measure.

We still need to understand what is happening, where our capacity goes and what is getting in our way. But the work itself is no longer our primary measure of progress.

It is not enough to know what we have done. We need to know what it has led to.

Yet it is surprisingly easy to introduce Product Backlogs, Epics, Stories, Tasks and boards while bringing the old logic with us. The project plan has disappeared, but the questions remain much the same: What is done? What is left? How much have we delivered? Are we following the plan?

More of the work has become visible, but we are still using the structure primarily to follow the work and control what gets done.

This is where the distinction between transparency and control becomes important. In product development, we make work visible so that the people working with and funding the product can understand what is happening, coordinate, learn and make better decisions about what to do next.

The same transparency can serve two very different purposes: controlling the work or steering towards outcomes.

The control logic becomes particularly visible when we try to give all work a place in the structure. There will always be maintenance, support, smaller fixes, technical work and other things that need attention without coming directly from the changes we have chosen to pursue.

This is where it is easy to start using Epics for something they are not intended for: as containers for different types of work. Maintenance Tasks might be collected under an Epic called Maintenance, support Tasks under Support. The backlog looks tidy and everything has found its place.

But in doing so, we have also lost the point of an Epic. What does it actually mean to prioritize Maintenance over Support? Individual Tasks within them may be more or less important, but the containers do not describe changes we can choose between. Nor do they ever finish, because new work keeps arriving.

An Epic is not a container for work. It represents a change we want to achieve.

Reduce recurring production incidents by 50 percent could, for example, be an Epic describing an internal improvement. Get twice as many first-time customers to return within a month could be another, with a more direct effect on customers and the business. Both describe changes we can prioritize against other changes, work towards, measure and eventually achieve.

Some maintenance Tasks may contribute to the first Epic, while others do not. All of them can still be visible in the Product Backlog. A Task does not need an Epic simply to have somewhere to belong.

In the shift from project to product, we can change the structure without changing its purpose – using a Product Backlog to create a plan of the work instead of organizing around desired outcomes and learning as we go.

The difference between tracking work and steering towards outcomes becomes perhaps clearest when we discover that we do not need to do everything we thought we would.

Suppose we believe ten things are needed to create a certain effect. We do three, measure what happens and discover that the effect has already been achieved.

If we follow up on the work, we see seven things remaining. If we follow up on the effect, we have discovered seven things we do not need to do.

Same reality. A completely different view of progress.

Nor do we need to know or structure all work in advance. Incidents, support requests and other unplanned work will consume capacity without us knowing exactly what it will be. We can leave room for it and make the work visible when it appears. And not everything needs to become a backlog item – just because work can be tracked does not mean there is value in tracking it.

We still need to understand the work, our capacity and what is happening. But we do not need to build our governance around controlling whether the work gets done.

The Control Trap happens when we introduce product structures and transparency but continue to use them with the project logic of focusing on scope, delivery and completed work: becoming better at tracking what we do than at understanding what we achieve.

More traps

The Negotiation Trap in Prioritization is one of several traps in the series Traps when moving from projects to product teams.

See the bigger picture

The control trap is one example of what can happen when we change the way we work without fully changing the underlying logic.

Our Project vs Product Organization in a Nutshell poster explores this shift from several perspectives — including strategy, execution, governance, teams, funding, culture and organization.

Written by

NÀr vi har nÄgot stort framför oss behöver vi dela upp det i mindre, hanterbara delar. Om vi vet vilken lösning som behövs Àr det ganska okomplicerat. Ett huvudkrav kan brytas ner i systemkrav och sedan i allt mer detaljerade krav. Delarna blir mindre, men de Àr fortfarande delar av en helhet som redan Àr definierad. Vi bygger dem, sÀtter ihop dem och testar den fÀrdiga lösningen.

I komplexitet fungerar det annorlunda. NÀr effekten av det vi bygger beror pÄ hur mÀnniskor agerar eller hur ett större system reagerar kan vi inte veta pÄ förhand vilken lösning som kommer att skapa den effekt vi vill uppnÄ. Vi kan ha data, erfarenhet och goda skÀl att tro pÄ en lösning, men tills vi ser vad som faktiskt hÀnder har vi en hypotes, inte ett svar.

En effektorienterad Epic börjar dĂ€rför inte med vad vi ska bygga, utan med den förĂ€ndring vi vill Ă„stadkomma. Till exempel: Öka andelen förstagĂ„ngsgĂ€ster pĂ„ restaurangen som kommer tillbaka inom tvĂ„ veckor frĂ„n 18 till 35 procent. Vi vet vart vi vill, men Ă€nnu inte vad som behöver byggas för att komma dit.

DÀrför kan vi heller inte pÄ förhand bryta ner Epicen i alla Stories som kommer att behövas. IstÀllet vÀljer vi en liten bit fungerande funktionalitet som vi tror kan föra oss nÀrmare den önskade effekten. Vi bygger den, ser vad som hÀnder och lÄter det vi lÀr oss pÄverka vad vi vÀljer att bygga hÀrnÀst. Arbetet blir bÄde inkrementellt och iterativt: vi bygger nÄgot fungerande samtidigt som vi lÀr oss vad nÀsta steg behöver vara.

Det avgörande Àr alltsÄ inte hur smÄ delarna Àr, utan vad de Àr delar av. Vid nedbrytning Àr de delar av en lösning vi redan har bestÀmt oss för att bygga. Med slicing Àr de istÀllet steg mot en effekt, dÀr varje steg ger oss möjlighet att lÀra innan vi bestÀmmer nÀsta.

I förflyttningen frÄn att bryta ner krav till att slic:a Epics kan vi behÄlla samma underliggande logik; att definiera allt arbete i förvÀg, fast i mindre delar.

Det lÀmnar ocksÄ mer av problemlösningen till teamet. IstÀllet för att fÄ en lösning dÀr de viktigaste besluten redan Àr fattade kan teamet anvÀnda sin samlade kompetens, tillsammans med det anvÀndarna och systemet visar oss, för att avgöra vad som Àr vÀrt att bygga hÀrnÀst.

Ibland Àr det mest vÀrdefulla vi lÀr oss att vi inte behöver bygga det vi trodde frÄn början. Om tre Stories skapar tillrÀckligt av den önskade effekten finns det kanske ingen anledning att bygga Story fyra till tio. De Àr inte ogjort arbete. De Àr sÄdant vi upptÀckte att vi inte behövde bygga. Det Àr sÄ vi kan skapa största möjliga effekt genom att bara bygga det som faktiskt behövs.

Och det Ă€r hĂ€r skillnaden blir förvĂ„nansvĂ€rt lĂ€tt att missa. Vi kan ersĂ€tta krav med Epics och Stories, göra vĂ„ra Stories smĂ„ och leverera fungerande funktionalitet en Story i taget – och Ă€ndĂ„ ha bestĂ€mt pĂ„ förhand vad som ska byggas.

Om en Epic Àr klar först nÀr alla Stories vi definierade frÄn början Àr klara arbetar vi fortfarande mot en fördefinierad lösning. Det vi lÀr oss lÀngs vÀgen kan pÄverka hur vi bygger den, men inte besvara den betydligt viktigare frÄgan: Behöver vi överhuvudtaget bygga resten?

Det Àr nedbrytningsfÀllan: vi tror att vi gör slicing mot en önskad effekt, nÀr vi egentligen fortfarande bryter ner en lösning som vi redan har bestÀmt oss för att bygga.

Den verkliga förflyttningen Àr inte frÄn stora delar till smÄ. Den Àr frÄn att bryta ner en redan bestÀmd lösning till att steg för steg upptÀcka vad som Àr vÀrt att bygga.

Fler fÀllor

Det hÀr Àr en av flera fÀllor i en serie: FÀllor i övergÄngen frÄn projekt till produktteam

Se helheten

NedbrytningsfÀllan i planering Àr ett exempel pÄ vad som kan hÀnda nÀr vi förÀndrar vÄrt sÀtt att arbeta utan att fullt ut förÀndra den underliggande logiken.

VĂ„r poster Project vs Product Organization in a Nutshell belyser den hĂ€r förflyttningen ur flera perspektiv – bland annat strategi, genomförande, styrning, team, finansiering, kultur och organisation.

Written by

When we have a large amount of work, we need to break it into smaller pieces. If we know that what we have in mind will create the outcome we want, this is fairly straightforward. We can define the solution, divide it into manageable parts and implement them.

But when the outcome depends on how people behave or how a complex system responds, we cannot know the effect upfront. We can have data, experience and good reasons to believe our idea will work, but until people start using it and the system starts responding, we have a hypothesis, not an answer.

A requirement describes something we have decided to build. A Main Requirement can be broken down into System Requirements and then into increasingly detailed requirements. The pieces become more manageable, but they remain parts of a predefined whole. We build the parts, integrate them and test the complete solution. The logic is essentially: define the solution, break it down, build the parts, integrate and test.

An outcome-oriented Epic starts somewhere else. Rather than defining what to build, it defines the change we want to create. For example: Increase the share of first-time restaurant guests who return within two weeks from 18% to 35%. We know what we want to achieve, but not everything we need to build to get there.

This means we cannot simply break the Epic down into all the Stories required to complete it. We don’t yet know which Stories will be needed. Instead, we choose a small piece of user functionality that we believe could move us towards the outcome. We deliver it, see what happens and let what we learn influence what comes next.

The work becomes both incremental and iterative. Each slice adds working functionality and gives us an opportunity to learn before making the next decision.

The question is not how small the pieces are. It is what they are pieces of.

In breakdown, the pieces are parts of a solution we have already decided to build, and we may need to integrate them before we can test the complete solution. In slicing, each piece gives us something working that allows us to see whether we are moving towards the desired outcome before deciding what to build next.

The Work Breakdown Trap: In the shift from breaking down requirements to slicing Epics, we can keep the same underlying logic; defining all the work upfront, just in smaller pieces.

Starting from an outcome also leaves more of the problem-solving with the team. Instead of receiving a solution whose important decisions have already been made, the team can use its collective expertise, together with feedback from users and the system, to decide what is worth building next.

And sometimes the most valuable thing we learn is that we don’t need everything we originally imagined.

If three Stories create enough of the desired outcome, there may be no reason to continue with Stories four through ten. They are not unfinished work. They are work we discovered we did not need to do. This is how we maximize outcome while minimizing output.

The difference can be surprisingly easy to miss. We can replace requirements with Epics and Stories, make the Stories small and deliver working functionality one Story at a time, while still deciding upfront what the complete solution should contain.

If completing all the predefined Stories means completing the Epic, we are still working towards a predefined solution. Learning may influence how we implement it, but it cannot answer the more important question: Should we build the rest of it at all?

That is The Work Breakdown Trap: we think we are slicing towards an outcome, while we are actually breaking down a solution we have already decided to build.

The real shift is not from large pieces to small pieces. It is from breaking down what we think we need to build to discovering what is worth building next.

More traps

The Negotiation Trap in Prioritization is one of several traps in the series Traps when moving from projects to product teams.

See the bigger picture

The Work Breakdown Trap is one example of what can happen when we change the way we work without fully changing the underlying logic.

Our Project vs Product Organization in a Nutshell poster explores this shift from several perspectives — including strategy, execution, governance, teams, funding, culture and organization.

Written by

When we have learned to work in a project-based way, planning can easily become something a few people do for others. A leader or expert, perhaps together with a few others, thinks through the work, creates the plan and prepares it for others to execute.

This can feel like an efficient use of people’s time. Why involve people before their expertise is needed, or have them spend time in discussions where they may have little to contribute?

And sometimes this is exactly the right thing to do.

If we are not operating in complexity, the problem may be understood well enough, cause and effect sufficiently predictable and existing expertise enough to determine a good solution. A technical specialist may be perfectly capable of planning a technical change, just as someone with deep testing expertise may be the right person to design a particular test approach. Not every decision benefits from involving the whole team.

The trap appears when we use the same planning logic while operating in complexity.

Complexity may come from the problem itself, technology, customer behaviour, organizational dependencies, competing needs or a changing environment. In these situations, we cannot know everything we need to make good decisions upfront. Some knowledge is distributed across different people and perspectives. Some simply do not exist yet. It emerges as we interact, experiment and learn.

When people start thinking together, someone may know something about the customer that changes how others see the problem. A developer may see a simpler possibility. Someone spots an organizational dependency. A question exposes an assumption nobody realized they were making. And very often someone says: “Wait – I didn’t know that.”

This is not a failure of preparation. It is learning happening. We are not simply sharing what we already know. We are creating new understanding together.

In complexity, this makes it difficult to separate planning neatly from execution. Execution itself creates knowledge. The more detailed decisions we make upfront, the more decisions we make before that knowledge exists.

One place this becomes very visible is the backlog. Work for a long time into the future is planned ahead and sometimes even planned into sprint buckets; Sprint 1, Sprint 2, Sprint 3 and several sprints beyond. It looks very different from a traditional project plan, but the underlying logic can be surprisingly similar: a few people have decided in advance what many people will do later.

Thinking ahead is not the problem. The problem is deciding too much before the learning that could change those decisions has happened.

The Planning Efficiency Trap: Moving from project planning to sprint planning can leave the old planning logic intact — in the name of efficiency.

The answer is not to have the whole team plan everything further ahead. That would simply spend more people’s time making decisions when knowledge is at its lowest. Instead, bring the relevant perspectives together when the thinking matters, as close to execution as reasonably possible. What we learn today should be allowed to influence what we decide tomorrow.

So the useful question is not whether planning should be done alone or together. Ask instead: Can we make this decision from what we already know, or do we need to learn our way towards it?

There is a longer-term consequence too. When a few people repeatedly do the thinking and others execute their plans, the team gets fewer opportunities to understand the product, challenge assumptions and develop its own ability to navigate complexity. Planning together where learning matters is therefore not only about making better decisions now. It gradually builds the team’s ability to make better decisions without someone else having to make those decisions for them.

That is the Planning Efficiency Trap. In complexity, we may try to make planning more efficient by involving fewer people and making more decisions upfront, precisely when we have the least knowledge to make them.

More traps

The Negotiation Trap in Prioritization is one of several traps in the series Traps when moving from projects to product teams.

See the bigger picture

The Planning efficiency trap is one example of what can happen when we change the way we work without fully changing the underlying logic.

Our Project vs Product Organization in a Nutshell poster explores this shift from several perspectives — including strategy, execution, governance, teams, funding, culture and organization.

Written by

Organizations rarely suffer from a lack of ideas. Management sees opportunities, problems and things that could be improved: new features, integrations, automations, capabilities and system changes. And when there are more ideas than we have capacity to pursue, we need to prioritize.

The question is what we prioritize.

When we are operating in complexity, the outcome may depend on how people behave, technology, organizational dependencies, competing needs or how a wider system responds. In these situations, we cannot know upfront which solution will create the effect we want. We may have data, experience and good reasons to believe an idea will work, but until we see how people and the system respond, it remains a hypothesis.

Yet it is surprisingly easy to prioritize as if we did know. Requirements, demands and solution ideas become backlog items. We may even start calling them Epics. We refine them, compare them and put them in order. The structure has changed, but the underlying question may still be the same: Which solution should we build first?

That is a reasonable question once we know what needs to be built. In complexity, however, there is an earlier question:

Which changes matter most for us to achieve now?

The Solution Prioritization Trap: When moving from project scope to a product backlog, we risk prioritizing what to build instead of what we want to achieve.

That small shift changes what we create direction around. A prioritized backlog of solutions gives us an order for things we might build. An outcome gives us a change to pursue.

Management will still have ideas about solutions, and those ideas can be valuable. But instead of automatically becoming future work, an idea can remain one possible way of achieving an outcome. This leaves room for the team to find a different solution, a simpler one or something much smaller that creates the same effect.

It also changes how we use the backlog. When solution ideas become future work, the backlog can gradually stretch months or even years ahead. What started as possibilities begins to look like a plan for future output.

But what we learn from what we build today should influence what we choose to build tomorrow. The more of the future we fill with predefined output, the less room we leave for future learning.

Thinking long term is not the problem. We should think far ahead about where we want to go and the changes we want to create. What we don’t need to decide far ahead is exactly what we will build to get there. A backlog can preserve ideas about the future. It doesn’t have to decide the future.

When decisions about output are made closer to the learning, we may discover that we need much less than we thought. If three Stories create enough of the desired outcome, Stories four through ten are not unfinished work. They are output we discovered we did not need.

That matters because every feature, integration and capability we add becomes something we need to maintain, support, test, secure and change. Unnecessary output costs twice: first to build, then to own.

That is the Solution Prioritization Trap: in complexity, we can become very good at prioritizing possible solutions when what we first need to prioritize is the change we want to create.

Prioritizing solutions is not the same as creating direction. Create clarity about the outcomes that matter, and decide what to build when you know enough to decide.

More traps

The Negotiation Trap in Prioritization is one of several traps in the series Traps when moving from projects to product teams.

See the bigger picture

The solution prioritization trap is one example of what can happen when we change the way we work without fully changing the underlying logic.

Our Project vs Product Organization in a Nutshell poster explores this shift from several perspectives — including strategy, execution, governance, teams, funding, culture and organization.

Written by

Organisationer lider sÀllan brist pÄ idéer. Ledningen ser möjligheter, problem och sÄdant som skulle kunna förbÀttras; nya funktioner, integrationer, automatiseringar, förmÄgor och systemförÀndringar. NÀr idéerna Àr fler Àn vi har kapacitet att genomföra behöver vi prioritera.

FrÄgan Àr vad vi prioriterar.

I komplexitet kan effekten av det vi levererar bero pÄ mÄnga saker: hur mÀnniskor agerar, hur tekniken fungerar, organisatoriska beroenden, konkurrerande behov eller hur ett större system reagerar. DÀrför kan vi inte veta pÄ förhand vilken lösning som kommer att skapa den effekt vi vill uppnÄ. Vi kan ha data, erfarenhet och goda skÀl att tro att en idé kommer att fungera, men tills vi ser vad som faktiskt hÀnder Àr den fortfarande en hypotes.

ÄndĂ„ Ă€r det förvĂ„nansvĂ€rt vanligt att vi prioriterar som om vi redan visste. Krav, behov och lösningsidĂ©er hamnar i backloggen. Vi kanske till och med börjar kalla dem Epics. Sedan förfinar vi dem, jĂ€mför dem och prioriterar dem mot varandra. Formen har förĂ€ndrats, men frĂ„gan vi försöker besvara Ă€r fortfarande densamma: Vilken lösning ska vi bygga först?

Det Àr en rimlig frÄga nÀr vi vet vad som behöver byggas. I komplexitet behöver en annan frÄga komma först:

Vilken förÀndring Àr viktigast för oss att Ästadkomma nu?


LösningsfÀllan: I övergÄngen frÄn projektomfattning till produktbacklogg finns en risk att vi börjar prioritera lösningar istÀllet för de effekter vi vill uppnÄ.
(more…)
Written by

NÀr vi Àr vana vid att arbeta projektbaserat kan planeringen lÀtt bli nÄgot som nÄgra fÄ gör Ät andra. En ledare eller expert, kanske tillsammans med nÄgra andra, tÀnker igenom arbetet, skapar planen och förbereder det som andra sedan ska genomföra.

Det kan framstÄ som ett effektivt sÀtt att anvÀnda mÀnniskors tid. Varför involvera mÀnniskor innan deras kompetens behövs? Varför lÀgga deras tid pÄ diskussioner dÀr de kanske inte har sÄ mycket att bidra med?

Och ibland Àr det precis rÀtt sÀtt att arbeta.

Om problemet Àr vÀl förstÄtt, sambanden mellan orsak och verkan tillrÀckligt förutsÀgbara och den kunskap som behövs redan finns, kan nÄgra fÄ mycket vÀl planera arbetet. En teknisk specialist kan vara bÀst lÀmpad att planera en teknisk förÀndring, precis som nÄgon med djup testkompetens kan vara rÀtt person att utforma ett specifikt testupplÀgg. Alla beslut blir inte bÀttre av att hela teamet involveras.

FÀllan uppstÄr nÀr vi anvÀnder samma logik för planering nÀr vi befinner oss i komplexitet.

Komplexiteten kan finnas i sjÀlva problemet, tekniken, hur kunder beter sig, organisatoriska beroenden, konkurrerande behov eller en förÀnderlig omvÀrld. DÄ kan vi inte veta allt vi behöver veta för att fatta bra beslut pÄ förhand. En del av kunskapen finns utspridd hos mÀnniskor med olika erfarenheter och perspektiv. Annan kunskap finns helt enkelt inte Ànnu, utan vÀxer fram nÀr vi interagerar, experimenterar och lÀr oss.

Det mĂ€rks nĂ€r mĂ€nniskor börjar tĂ€nka tillsammans. NĂ„gon vet nĂ„got om kunden som förĂ€ndrar hur de andra ser pĂ„ problemet. En utvecklare ser en enklare möjlighet. NĂ„gon annan upptĂ€cker ett organisatoriskt beroende. En frĂ„ga synliggör ett antagande som ingen ens var medveten om att vi gjorde. Och ganska ofta sĂ€ger nĂ„gon: ”VĂ€nta – det dĂ€r visste inte jag.”

Det hÀr Àr inte ett tecken pÄ dÄliga förberedelser. Det Àr lÀrande. Vi delar inte bara det vi redan vet utan vi skapar ny förstÄelse tillsammans.

Det Àr ocksÄ dÀrför planering och genomförande blir svÄra att separera i komplexitet. NÀr vi börjar göra saker lÀr vi oss sÄdant som vi inte kunde veta innan. Ju fler detaljerade beslut vi fattar pÄ förhand, desto fler beslut fattar vi alltsÄ innan tillrÀcklig kunskap finns.

Det blir sÀrskilt tydligt i backloggen. Arbete lÄngt in i framtiden planeras i förvÀg och ibland till och med in i olika kommande sprintar. PÄ ytan ser det helt annorlunda ut Àn en traditionell projektplan, men logiken kan vara förvÄnansvÀrt lik: nÄgra fÄ har i förvÀg bestÀmt vad mÄnga andra ska göra senare.

Att tÀnka framÄt Àr inte problemet. Problemet Àr att bestÀmma för mycket innan det lÀrande som skulle kunna förÀndra besluten har skett.

EffektivitetsfÀllan: I övergÄngen frÄn projektplanering till sprintplanering kan strÀvan efter effektivitet göra att vi behÄller samma planeringslogik.
(more…)
Written by
Written by
Johan Westerlund

Innovation som fenomen undflyr styrning. Nya idéer framstÄr ofta som otydliga eller svÄra att vÀrdera, och det som i slutÀndan skapar genombrott passar sÀllan in i etablerade modeller. Innovation Àr inte bara en systematisk process, det Àr ett avsteg frÄn det förvÀntade som krÀver utrymme för det som utmanar och inte direkt kan motiveras i traditionella termer av lönsamhet. FramgÄngsrika organisationer förmÄr dÀrför balansera behovet av struktur med en genuin tolerans för osÀkerhet, friktion och det oförutsÀgbara.

Bakgrund

MĂ„nga vĂ€letablerade produkt- och tjĂ€nstebolag Ă€r organiserade för effektivitet kring sina etablerade erbjudanden. Man har hittat en fungerande affĂ€rsmodell och strukturerat organisationen för att skala, kontrollera kostnader och optimera det som redan fungerar. 

I denna fas kan innovation fortsĂ€tta inom befintlig affĂ€r genom exempelvis produktförlĂ€ngningar, nya format eller koncept – det som brukar kallas en “product exploit”-fas. Denna fas Ă€r en viktig fas för ett företags framgĂ„ng i att skapa lĂ„ngsiktig lönsamhet, vilket i sin tur kan skapa budgetutrymme för att ta fram nya erbjudanden.

För att möjliggöra detta arbetar mÄnga företag med tydliga processer och projektmodeller, som exempelvis PROPS och Stage-Gate. Dessa skapar förutsÀgbarhet och kvalitet, och fungerar vÀl sÄ lÀnge innovationen ligger nÀra det befintliga erbjudandet.

Produktlivscykel dÀr mognadsfasen kan förlÀngas genom vidareutveckling och innovation.

Produktlivscykel dÀr mognadsfasen kan förlÀngas genom vidareutveckling och innovation.

Disruptiv Innovation – innovation av ny produkt eller tjĂ€nst

Förr eller senare nÄr Àven etablerade företag en punkt dÀr ett större innovationssprÄng blir nödvÀndigt, drivet av förÀndrade kundbehov, ny konkurrens, teknologiska skiften som AI eller nya affÀrsmöjligheter, till exempel genom data. Utmaningen Àr att organisationen nu Àr byggd för att optimera det befintliga, inte för att skapa nÄgot nytt. Nya initiativ saknar naturlig hemvist, krÀver andra kompetenser, nya produktionsförutsÀttningar och ibland helt nya sÀljkanaler.

Ofta startas arbetet av mindre, engagerade team. Men den verkliga utmaningen uppstĂ„r nĂ€r idĂ©er ska realiseras. Den etablerade organisationen Ă€r upptagen med att leverera pĂ„ befintliga affĂ€rer, och nya initiativ konkurrerar om uppmĂ€rksamhet. Det medför att det ofta krĂ€vs ett starkt business case för att fĂ„ prioritet trots att lönsamheten Ă€nnu inte gĂ„r att bevisa. Resultatet blir att initiativ lĂ€tt fastnar i hinder kopplade till produktion, lansering och skalning – och riskerar att dö ut innan man vet om de faktiskt kan bli framgĂ„ngsrika.

Att utveckla nya erbjudanden innebÀr att navigera i hög osÀkerhet. Traditionella projektmodeller Àr byggda för effektivitet och förutsÀgbarhet, inte för det experimentella och iterativa arbetssÀtt som innovation krÀver.

Frikopplad innovationskraft

Ett sÀtt att bÄde bevara den befintliga organisationens styrkor och samtidigt bygga innovationsförmÄga för nya affÀrer Àr att etablera en frikopplad arena, till exempel ett X-Lab eller en sÄ kallad NeXT-enhet.

En frikopplad enhet Àr en strukturerad innovationsarena skapad för att utforska nya möjligheter utanför den ordinarie organisationens processer och styrmodeller. Genom en parallell, teamcentrisk organisation möjliggörs hypotesdriven utveckling, snabb prototypframtagning och tidig validering av nya erbjudanden innan större investeringar eller organisatoriska förÀndringar görs.

Med iterativa och experimentella arbetssÀtt arbetar man systematiskt med att reducera de största osÀkerheterna. Fokus ligger pÄ att testa affÀr, teknik, produktionsmöjligheter och kundvÀrde i smÄ steg genom att gradvis utveckla koncept och prototyper för att lÀra sig om nya konsumentsegment och marknader till skalbara produkter/tjÀnster.

12 FramgÄngsfaktorer

Oavsett vilken modell man vÀljer för den tidiga utvecklingsfasen för innovation finns det framgÄngsfaktorer att ta i beaktning. Innovation krÀver en medveten balans mellan tydliga ramverk och en hög grad av flexibilitet. Strategiska strukturer i form av riktning, dedikerade team och anpassad finansiering skapar nödvÀndiga förutsÀttningar för fokus och framdrift, medan sjÀlva arbetssÀttet inom dessa ramar mÄste förbli experimentellt, iterativt och genuint anpassningsbart.

Nedan följer ett urval, baserat pÄ vÄra erfarenheter i olika organisationer och branscher:

(more…)
Related Trainings
Our Trainings
Product Owner Training with Possible Certification – 2 Days On Site
Target Group: Who are already acting as a product owner, or preparing to start in the role. It could also be that you are working closely with the Product Owners.
Teachers: Mia Kolmodin, Sofia Hedlund, Elinor Lange
2-3 December, Stockholm